Generating topic review reports
IXIA CCMS Scheduler can be configured so that users with the role of project coordinator can receive status updates on topics in review status.
Criteria for generating a report
The documents must meet the following criteria:
- The role of project coordinator is assigned.
- Topics are in the Authoring:review status.
- Topics are assigned to the reviewer.
- Topics are assigned a due date.
Report details
The job sends one email per user. The email includes an Excel
spreadsheet in attachment, listing the topics that need to be reviewed along with
due dates and reviewer information. An example of the Excel spread sheet of topic
review report is shown as an example: